These project descriptions represent a sample of the broad range of ICT projects Titan undertakes for clients. Case studies are provided for some of these projects which give further detail on the project and outcomes.
Pinjarra Retirement Village FTTP and Entertainment System
The concept of senior living is radically different from what was delivered less than a decade ago. As the baby boomers enter their “golden years” they have become far more techno savvy and aided with a high level of disposable income, they are expecting to move into a retirement community that provides them with a truly “digital lifestyle”
API – Pre Feasibility ICT Report
Titan ICT Consultants were engaged to complete a Pre Feasibility Report analysing and recommending all of the ICT infrastructure requirements for API’s Pilbara Iron Ore mining, rail and port projects.
BHP Billiton – ICT Benchmarking Study for the Quantum Project
Titan ICT Consultants provided a benchmarking study for BHP Billiton’s Quantum Project. The works reviewed existing ICT Infrastructure and the current expansion works in their RGP program and outlined overlaps, gaps and recommended ways forward to develop a consistent whole of business approach to their ICT infrastructure deployment.
Rio Tinto - Remote Operation Control Centre (ROC)
Titan ICT Consultants were engaged to complete a scoping and costing exercise to develop the ICT requirements for a remote operations control centre based in Perth. The ROC will provide mining operations, port operations and rail operations.
Murchison Metals - Feasibility study for communications between Jack Hills & Weld Range and Oakajee Port
Titan ICT Consultants provided an Option Analysis on the feasibility of various communication systems to meet the operational requirement of mine to port communications and rail communications.Pilbara Iron - Optical Transmission Network Strategy
Titan ICT Consultants are presently completing an OTN strategy for Rio Tinto throughout the Pilbara. The works are driven by the need for high speed reliable and cost effective communications between Pilbara Iron’s mining, rail, electricity generation and port facilities.
We would be more than happy to provide many other relevant projects which demonstrate our experience in the resource and rail industry.
Pilbara Iron - Design and implementation of a remote voice and data network
Titan ICT Consultants were commissioned to design and implement a construction camp voice and data network in a remote Pilbara location. The solution involved the integration of satellite VoIP and data networking.
CP Mining
Titan ICT Consultants have been commissioned to document and report the existing CP Mining LAN/WAN configuration, assess and analyse Telstra agreements, document existing telecommunications projects for the Cape Preston mine site, design purchase project manage the installation of the last mile radio link to the temporary construction camp.
CP Mining – Site requirement
Titan ICT Consultants have been commissioned to gather data and report on business LAN requirements for the Cape Preston mine site development.
Radio Link to Telstra Services
Nowergup SDH Microwave (MW) Link
Gindalbie Iron Ore Project
FMG Communication Network Extension
MPLS/DWDM Network in Pilbara
- Client:Rio Tinto
- Project:PHiSCom Wave 1
- Our Services: Plan, Design, Site acquisition, Installation and Commissioning
ICT White Papers - Download
A range of industry ICT Whitepapers are available for download. See list below:
Back To Top